|
Church Street Downtown Connector
A grant proposal for ISTEA Grant funds in 2008 is pending. This is to build a connecting separated trail from the Dover Bike Trail through downtown Sandpoint on Church Street to the new Bridge Street Bike/pedestrian Bridge Project. This will connect to the Sandpoint Byway trail when completed.
Photos

Aerial view of project connecting to Bridge Street Project.

Schematic of trail at 2nd Street in Sandpoint.
|